1. Please pave the conveyor belt in strict accordance with the belt
central line that production department gives. Belt should be paved to
make sure flat, straight, and below rollers complete and effective,
sweeper should be conformed to the requirements, lining plate of head
and tail frame, as well as the guardrail should be complete and
reliable.
2. Belt conveyor parts should be transported according to the order of tail frame, middle frame and the head frame, after transporting to the designated location, please put them away as per the transportation order along the roadway.
3. Belt conveyor should be installed according to the order of head frame, middle frame, the tail frame, central line of each pulley belt conveyor should be in a straight line.
4. Belt conveyor parts should meet the requirements, the anchor bolt should be fixed and tighten reliably.
5.All sorts of protection device of belt (Anti-frog protection, speed protection, temperature protection, automatic water spray protection if overheat, deflection protection) after the installation is complete, please test each protection device to make sure they are and sensitive working in good condition.
6. Please set up a bridge for walking where people go cross the belt conveyor frequently.
7.The electric switch protection device must be completed which should be sensitive and reliable ,the protection setting values must conform to the requirements, and keep them from water and rain, there should be enough space for walking and repairing, cable should be placed neatly and in order, communication signal should be in good condition, light and sound should be clear and reliable, control signal device should be complete, sensitive and reliable, explosion-proof lighting lamps and lanterns should be installed.
8. Both the head and tail section of belt conveyor must be equipped with two fire extinguishers and fire sand box which is not less than 0.2 m3.
9. Sweeper installation must meet the production needs. Sweeper and conveyor belt surface must contact well to ensure appropriate tightness and uniform contact, please also make sure both the head and tail section must be equipped with a sweeper.
10. In the section that the roadway changes to slope where belt waves easily, to ensure the belt frame transition smoothly, you can by adjust the supporting leg of conveyor.
11.After completing all the installation ,ensure all rollers and the belt are connected in good condition, then you can commissioning the conveyor.
2. Belt conveyor parts should be transported according to the order of tail frame, middle frame and the head frame, after transporting to the designated location, please put them away as per the transportation order along the roadway.
3. Belt conveyor should be installed according to the order of head frame, middle frame, the tail frame, central line of each pulley belt conveyor should be in a straight line.
4. Belt conveyor parts should meet the requirements, the anchor bolt should be fixed and tighten reliably.
5.All sorts of protection device of belt (Anti-frog protection, speed protection, temperature protection, automatic water spray protection if overheat, deflection protection) after the installation is complete, please test each protection device to make sure they are and sensitive working in good condition.
6. Please set up a bridge for walking where people go cross the belt conveyor frequently.
7.The electric switch protection device must be completed which should be sensitive and reliable ,the protection setting values must conform to the requirements, and keep them from water and rain, there should be enough space for walking and repairing, cable should be placed neatly and in order, communication signal should be in good condition, light and sound should be clear and reliable, control signal device should be complete, sensitive and reliable, explosion-proof lighting lamps and lanterns should be installed.
8. Both the head and tail section of belt conveyor must be equipped with two fire extinguishers and fire sand box which is not less than 0.2 m3.
9. Sweeper installation must meet the production needs. Sweeper and conveyor belt surface must contact well to ensure appropriate tightness and uniform contact, please also make sure both the head and tail section must be equipped with a sweeper.
10. In the section that the roadway changes to slope where belt waves easily, to ensure the belt frame transition smoothly, you can by adjust the supporting leg of conveyor.
11.After completing all the installation ,ensure all rollers and the belt are connected in good condition, then you can commissioning the conveyor.