2015年9月4日星期五

What are the Components of Belt Conveyor

1. Conveyor frame parts
Including: head frame, tail frame, intermediate frame and supporting leg which are produced by cutting, welding, punching and polishing with standard channel, angle iron, steel and other. 
2. Composition of other components:
i. Roller
Roller has the highest quantity and is the most carrying parts of belt conveyor. Impact roller, friction centering carrier roller, belt conveyor roller, and so on are included. The lifespan of roller is depends on the usage, usually the roller needs to be replaced every one to two years.


belt conveyor rollers
 
ii. Drum pulley 
Power conversion device and redirection device of belt conveyor including the drive pulley and return pulley. It is durable but the bearings need to be lubricated.

belt conveyor pulley manufacturer
 
iii. Conveyor belt
It is one of the most expensive parts of belt conveyor, and also an important part to carry the materials. Hence, it needs to be maintained properly.
iv. Driving device
It is the power source of belt conveyor. Commonly motor works together with reducer, however, motorized pulley can also be used. 
3. Cleaning device
Including : head cleanser, non-loaded cleanser, tail cleanser, spring cleanser and so on.

belt conveyor cleaning device
 
4. Protection device
Including : pull-cord switch, running deviation switch, skid detector and so on.

pull switch of belt conveyor
 
5. Electronic control device: 
Including: electric cabinet, power protection device.
All the parts mentioned above are needed to ensure the normal operation ad production of belt conveyor, hope this article is helpful!

 belt conveyor delivery
--------------------------------------------------------------------------------------------------------------------------------------------

Henan Pingyuan Mining Machinery Co., Ltd is the most professional manufacturer of Belt conveyor, and Vibrating screenBucket elevatorScrew conveyorScraper conveyor using the world's most advanced technology, we are willing to serve every company to meet your custom needs. Our goal is "be the future global leader of mining machinery industry". If you have any question, please feel free to consult us (www.pkmachinery.com) we will give you accurate and timely service.

2015年8月31日星期一

What Should We Note During the Installation of Large Angle Belt Conveyor

Large angle belt conveyor can be transported with large inclination , it even can be vertical. It adopts sidewall belt as the main part. The advantages are: large conveying amount, small space occupation ,small noise etc. which is widely used for conveying powder, blocked material. Here PK Machinery will introduce the installation notes during installation:
1.Check whether the components of large angle belt conveyor are complete or not 
Generally speaking, belt conveyor includes lots of components: head & tail frame, concave & convex segmental arc frame and middle frame, however, the quantity of trough roller frame, rollers and sealing cover is big, you need to check carefully and guarantee the components are transported to the right place.
2.Installation, positioning and welding of head and tail frame, concave and convex segmental arc frame
First of all, please find the center line of the belt conveyor by using a steel wire. When installation, please make the head & tail frame, concave & convex segmental arc frame subject to the center line.


convex segmental arc frame
 

3.Check belt running and adjust the belt if it runs off tracking
After installation of belt, trough roller, self-aligning roller and vertical roller, connect the power supply , run the belt and adjust the belt offset distance .
4.Installation of large dip Angle belt conveyor accessories and bolts
After adjusting the belt, you can start to install the sealing cover, head cover and fastening bolts.


Angle belt conveyor design

--------------------------------------------------------------------------------------------------------------------------------------------

Henan Pingyuan Mining Machinery Co., Ltd is the most professional manufacturer of Belt conveyor, and Vibrating screenBucket elevatorScrew conveyorScraper conveyor using the world's most advanced technology, we are willing to serve every company to meet your custom needs. Our goal is "be the future global leader of mining machinery industry". If you have any question, please feel free to consult us (E-mail: info@pkmachinery.com) we will give you accurate and timely service.

2015年8月28日星期五

Three Horizontal Sections of Large Angle Belt Conveyor

Large angle belt conveyor is suitable for the unit mass of 500 ~ 2500 kg/m3 and the material large size of about 100 ~ 250 mm, the features of large angle belt conveyor are: simple structure, convenient maintenance, space saving and investment saving. Here PK Machinery will explain and introduce three kinds of horizontal section:
1. Upper horizontal section
In order to adapt to the requirement of different discharge height, the head frame is divided into low type frame (head frame height = 1000 mm), middle type head frame (head frame height = 1100 ~ 1100 mm) and high type head frame (head frame height = 1600 ~ 1600 mm).
Correspondingly, low type convex segmental arc frame and low type middle frame support (matched head height = 1000 mm), middle type convex segment frame and middle type frame support (matched head frame height = 1100 ~ 1500 mm), high type convex segment frame and high type middle frame support (matched head frame height = 1600 ~ 1600 mm) will match with upper horizontal section respectively.

2. Lower horizontal section
The lower horizontal section adopts low type middle frame support.

3. Inclined section
The inclined section of large angle belt conveyor adopts low type middle frame support. When the conveyor inclined angle β ≧ 45 °, we suggest adopting Ⅱseries low type middle support.


large angle of belt conveyor drawing
The connection of upper horizontal section and inclined adopts the convex arc segments frame, and the lower horizontal section and inclined section adopt concave segmental arc frame to connect so as to realize the smooth conveyor belt transition.

large angle belt conveyors manufacturer

--------------------------------------------------------------------------------------------------------------------------------------------

Henan Pingyuan Mining Machinery Co., Ltd is the most professional manufacturer of Belt conveyor, and Vibrating screenBucket elevatorScrew conveyorScraper conveyor using the world's most advanced technology, we are willing to serve every company to meet your custom needs. Our goal is "be the future global leader of mining machinery industry". If you have any question, please feel free to consult us (E-mail: info@pkmachinery.com) we will give you accurate and timely service.

2015年8月27日星期四

Why will Belt Conveyor Motorized Pulley Get Rusty

During the operation process of belt conveyor, it will occur some problems due to incorrect method of using or wear and tear, therefore, we need to know some knowledge in order to ensure the normal operation. Here PK Machinery will list some reasons why motorized pulley of belt conveyor will rust:
1. Electroplating time is not enough, it dues to the problem of process flow;
2. Air liquidity of the location where motorized pulley stores is not good, or the location is wet, it is may due to the large difference in temperature;
3. If the package sealing breaks, the motorized pulley may oxidate and get rusty;
4. The most important point is that before electroplating, the dirt on motorized pulley surface is not being cleaned well, it is also one of the reasons why the motorized pulley will get rusty.


 
 motorized pulley sulliper

--------------------------------------------------------------------------------------------------------------------------------------------

Henan Pingyuan Mining Machinery Co., Ltd is the most professional manufacturer of Belt conveyor, and Vibrating screenBucket elevatorScrew conveyorScraper conveyor using the world's most advanced technology, we are willing to serve every company to meet your custom needs. Our goal is "be the future global leader of mining machinery industry". If you have any question, please feel free to consult us (E-mail: info@pkmachinery.com) we will give you accurate and timely service.

2015年8月25日星期二

Installation and Notes of Belt Conveyor Anti-rain Cover

1) Open cover and fixed cover are manufactured with the galvanized steel plate or the colorized coating steel plate. Generally ,there will be 1 piece of open cover and 7 pieces of fixed covers installed every 8 pieces covers, the 2 kinds covers also can be installed side by side alternately ( it also can be matched according to customer’s requirement). At first, fasten the fixed conveyor with drilling rivets and based on the line which is upward 30mm from the top of Z type steel, fix a mounting hole every 450mm, every piece of cover overlaps 2 wave crests. Open cover overlaps above the fixed covers in order to open conveniently.

open conveyor anti-rain cover
 
2) The Z type steel or the connection angle iron which is the main support frame of the conveyor cover, the length is equal to the length of the installed conveyor cover
The Z type steel or the connection angle iron is welded on the channel steel or the little stiffening angle iron on both sides of the conveyor

3) Install the covers (fixed covers) from one side to another side along the conveyor, during installation, people are not allowed to stand on the covers and no hard beating and hitting is allowed.
4) Mount the fixed covers on the Z type steel with the drilling rivet. The mounting points are not less than 4 on every piece.

5) 1 piece of observation window cover could be installed every 10 pieces for convenient checking and inspecting. It is decided by users.

6) Salient point cover is only used for the salient points of the convex-concave of the conveyor. Deviation switch cover is only used for covering the deviation switch. These 2 kinds covers also can overlap the fixed covers.

fixed conveyor anti-rain cover
 

4. Note

1) During the installation, please handle the anti-rain cover carefully and avoid scratching.

2) After installing the accessories, please clean the surface and paint the scratched points again.

anti-rain cover of incline belt conveyor

 
--------------------------------------------------------------------------------------------------------------------------------------------

Henan Pingyuan Mining Machinery Co., Ltd is the most professional manufacturer of Belt conveyor, and Vibrating screenBucket elevatorScrew conveyorScraper conveyor using the world's most advanced technology, we are willing to serve every company to meet your custom needs. Our goal is "be the future global leader of mining machinery industry". If you have any question, please feel free to consult us (E-mail: info@pkmachinery.com) we will give you accurate and timely service.

2015年8月22日星期六

Installation of Open Belt Conveyor Cover

View 1: Installation drawing of whole open –close type 

whole open-close conveyor cover drawings

 
View 2: Installation drawing of half open –close type (double chip open- close type) 

half-open-close-conveyor-cover-drawings
 
1) installation of handle
After overlapping the open cover and fixed cover, based on the center line of the cover, the location upward 250mm is the center line used for installing the handle (it can be adjustable according to height of the conveyor support frame). Put the handle straightly and drilling a 4-Φ5 hole, then fasten with the rivets.

2) installation of hinge
Adjust one side of the cover up higher from the top of the Z type steel (angle iron) 5mm, inward 140mm from the front and back sides of the cover, and upward 27mm is the location of the hinge, then drill holes Φ5 and fasten with the rivet. Others holes are also fastened with the rivets.

3) installation of the lock catch
After installing the hinge, on the other side of the cover, inward 185mm from front and back sides of the cover, then based on the bottom, upward 36mm and 77mm , drill holes Φ5 and fasten the lock with the rivet, next keeping the lock locking( clamp status), and then putting the lock nose on the Z type steel straightly and drilling hole to fasten.

4) installation of the open cover
Overlap the open cover on the bilateral fixed covers. The overlapped length should be the length of 2 pitches of waves, then put the other side of the hinge appressed on the angle iron and drill hole 4-Φ5 with the rivet fastened.

conveyor belt rainproof cover

--------------------------------------------------------------------------------------------------------------------------------
Henan Pingyuan Mining Machinery Co., Ltd is the most professional manufacturer of Belt conveyor, and Vibrating screenBucket elevatorScrew conveyorScraper conveyor using the world's most advanced technology, we are willing to serve every company to meet your custom needs. Our goal is "be the future global leader of mining machinery industry". Have any questions, please contact us without any hesitation.

2015年8月21日星期五

Installation of Belt Conveyor Cover Support Frame

 Belt conveyor cover is applicable to power plant, cement plant, mines and other major factories which is waterproof, dustproof and windproof, it plays a great role in reducing the loss during the process of conveying goods ,making the conveyor belt more safe and reliable in operation and purifying the environment .

conveyor belt cover
As the main support frame of the conveyor cover, the length of Z type steel or the connection angle iron is equal to the length of the installed conveyor cover. Please weld the Z type steel or the connection angle iron on the channel steel or the little stiffening angle iron on both sides of the belt conveyor. If need the stiffening angle iron, at first, weld the stiffening angle iron on both sides of the conveyor, then weld the Z type steel or the connection angle iron on the stiffening angle iron, detailed steps are as following:
 1) first weld the little stiffening angle iron ∟40*40*100*4(just for reference, it also can be indicated by users) every 1.5m or 2 m on both sides of the belt conveyor ( eudipleural ). The height from the intermediate frame to the top of little stiffening angle iron should ≥50mm ( it also can be decided by users).
2) Then weld the Z type steel 30*50*30*(2.0~3.0),( just for reference, it also can be replace by angle iron) and fix it on both sides of the intermediate frame top, the inner size should be 10-20mm bigger than outside size of intermediate frame.
3) After being welded please remove welding slag then paint.



rainproof cover drawing
--------------------------------------------------------------------------------------------------------------------------------
Henan Pingyuan Mining Machinery Co., Ltd is the most professional manufacturer of Belt conveyor, and Vibrating screenBucket elevatorScrew conveyorScraper conveyor using the world's most advanced technology, we are willing to serve every company to meet your custom needs. Our goal is "be the future global leader of mining machinery industry". Have any questions, please contact us without any hesitation.